Isle Of Grain

Isle Of Grain, Conrad (Grain) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Northfleet East.

Customer
Conrad (Grain) Limited
Status
Accepted to connect
Capacity
7 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Northfleet East
Bulk supply point
Northfleet East 33kV
Point of connection
Grain 11kV
Voltage
11 kV
Date accepted
12 Jul 2018
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Rochester
Postcode
ME3 0AB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.