Grid GuardianOpen the evidence in the app

Henley Road Solar Farm

Henley Road Solar Farm, OnPath Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 35 MW, grid supply point Bramford.

Customer
OnPath Energy Limited
Status
Accepted to connect
Capacity
35 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Bramford
Bulk supply point
Ipswich Grid
Voltage
33 kV
Date accepted
20 Aug 2026
In a connection queue
Yes
Row last updated by the DNO
14 Sept 2026
Licence area
EPN
Address
Akenham Hall Farm, Ipswich
Postcode
IP6 0HL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source