Hatfield Avenue

Hatfield Avenue, Low Carbon Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.68 MW, grid supply point Elstree.

Customer
Low Carbon Energy Limited
Status
Accepted to connect
Capacity
1.68 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Elstree
Bulk supply point
Hatfield Grid 33kV
Point of connection
Tunnel Primary 11kV
Voltage
11 kV
Date accepted
29 Oct 2019
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Hatfield
Postcode
AL10 9TX
Export MPAN
1050001382080

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.