Grid GuardianOpen the evidence in the app

Halsville Quarter

Halsville Quarter, WSP, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point West Ham.

Customer
WSP
Status
Connected
Capacity
1.2 MW
Maximum import capacity
0 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
West Ham
Voltage
132 kV
Date accepted
9 Oct 2019
In a connection queue
No
Row last updated by the DNO
12 Dec 2025
Licence area
London Power Networks plc
Address
Halsville Road, Canning Town
Postcode
E16 1EA

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source