Hall Farm

Hall Farm, OPDE UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.4 MW, grid supply point Bramford.

Customer
OPDE UK Limited
Status
Accepted to connect
Capacity
49.4 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Bramford
Bulk supply point
Diss Grid
Voltage
132 kV
Date accepted
22 Jul 2026
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
The Street, Diss
Postcode
IP22 2BL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.