Hadlow Solar Park Lilley Farm
Hadlow Solar Park Lilley Farm, British Solar Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16.5 MW, grid supply point Northfleet East.
- Customer
- British Solar Limited
- Status
- Connected
- Capacity
- 16.5 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Northfleet East
- Bulk supply point
- Pembury Grid 33kV
- Voltage
- 33 kV
- Date connected
- 3 Oct 2015
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Sherenden Road, Tonbridge
- Postcode
- TN11 0PD
- Export MPAN
- 1900091217052
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.