Gyron Maylands Datacentre

Gyron Maylands Datacentre, Gyron Internet Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8 MW, grid supply point Elstree.

Customer
Gyron Internet Limited
Status
Connected
Capacity
8 MW
Maximum import capacity
0 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Elstree
Bulk supply point
Piccotts End Grid 33kV
Point of connection
Industrial Primary 11kV
Voltage
11 kV
Date connected
29 Oct 2018
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Hemel Hempstead
Postcode
HP2 7DF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source