Gunfleet Sands Offshore Transmission
Gunfleet Sands Offshore Transmission, National Grid Electricity Transmission PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 172.8 MW, grid supply point Bramford.
- Customer
- National Grid Electricity Transmission PLC
- Status
- Connected
- Capacity
- 172.8 MW
- Technology
- Offshore wind (Offshore wind turbines)
- Flexible connection
- No
- Grid supply point
- Bramford
- Voltage
- 132 kV
- Date connected
- 18 Aug 2009
- In a connection queue
- No
- Row last updated by the DNO
- 14 Dec 2021
- Licence area
- EPN
- Address
- Gunfleet Sands Offshore Transmission, Little Clacton
- Postcode
- CO16 9QG
- Export MPAN
- 1099000000424
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.