Gunfleet Sands Offshore Transmission

Gunfleet Sands Offshore Transmission, National Grid Electricity Transmission PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 172.8 MW, grid supply point Bramford.

Customer
National Grid Electricity Transmission PLC
Status
Connected
Capacity
172.8 MW
Technology
Offshore wind (Offshore wind turbines)
Flexible connection
No
Grid supply point
Bramford
Voltage
132 kV
Date connected
18 Aug 2009
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Gunfleet Sands Offshore Transmission, Little Clacton
Postcode
CO16 9QG
Export MPAN
1099000000424

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.