Guildford STW

Guildford STW, Thames Water, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point West Weybridge.

Customer
Thames Water
Status
Accepted to connect
Capacity
4 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
West Weybridge
Bulk supply point
Guildford Grid 132kV
Point of connection
Guildford 'B' 11kV
Voltage
11 kV
Date accepted
2 Nov 2022
Target energisation
30 Apr 2025
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Westfield Road, Guilford
Postcode
GU1 1SF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.