Green Lane Solar Farm

Green Lane Solar Farm, Low Carbon UK Solar Investment Company Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Northfleet East.

Customer
Low Carbon UK Solar Investment Company Limited
Status
Accepted to connect
Capacity
40 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Northfleet East
Voltage
132 kV
Date accepted
20 Mar 2023
Target energisation
30 Oct 2037
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Marden, Tonbridge
Postcode
TN12 9LN

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.