Green Lane Solar Farm
Green Lane Solar Farm, Low Carbon UK Solar Investment Company Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Northfleet East.
- Customer
- Low Carbon UK Solar Investment Company Limited
- Status
- Accepted to connect
- Capacity
- 40 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Northfleet East
- Voltage
- 132 kV
- Date accepted
- 20 Mar 2023
- Target energisation
- 30 Oct 2037
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Marden, Tonbridge
- Postcode
- TN12 9LN
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.