Grange Way

Grange Way, AMP Energy Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.54 MW, grid supply point Bramford.

Customer
AMP Energy Services Limited
Status
Connected
Capacity
2.54 MW
Maximum import capacity
0.12 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Colchester Grid 33kV
Point of connection
Mersea Rd Primary 11kV
Voltage
11 kV
Date connected
20 May 2022
In a connection queue
No
Row last updated by the DNO
14 Aug 2023
Licence area
EPN
Address
Colchester
Postcode
CO2 8GU
Export MPAN
1050002342390
Import MPAN
1050002336980

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.