Gascoyne Solar Farm

Gascoyne Solar Farm, QE Development Holdco Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Brimsdown (EPN).

Customer
QE Development Holdco Limited
Status
Accepted to connect
Capacity
60 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Brimsdown (EPN)
Voltage
132 kV
Date accepted
28 May 2026
In a connection queue
Yes
Row last updated by the DNO
12 Jun 2026
Licence area
EPN
Address
Cecil Road, Potters Bar
Postcode
EN6 3QB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.