Grid GuardianOpen the evidence in the app

FDG F-07 Land At Weirs Drove

FDG F-07 Land At Weirs Drove, Aura Power Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Burwell.

Customer
Aura Power Limited
Status
Connected
Capacity
49.9 MW
Maximum import capacity
49.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Burwell
Voltage
132 kV
Date connected
31 Oct 2021
In a connection queue
No
Row last updated by the DNO
14 Mar 2022
Licence area
EPN
Address
Cambridge
Postcode
CB25 0BP

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source