Grid GuardianOpen the evidence in the app

FDG F-04 Chear Farm

FDG F-04 Chear Farm, AGR Peak Power Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Burwell.

Customer
AGR Peak Power Limited
Status
Connected
Capacity
15 MW
Maximum import capacity
10 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
Yes (capacity not firm)
Grid supply point
Burwell
Bulk supply point
Histon Grid 33kV
Voltage
33 kV
Date connected
3 Mar 2022
In a connection queue
No
Row last updated by the DNO
14 Sept 2022
Licence area
EPN
Address
Cambridge
Postcode
CB6 3FS
Export MPAN
1050002211711
Import MPAN
1050002211702

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source