Edmonton Incineration Plant
Edmonton Incineration Plant, London Waste Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Tottenham.
- Customer
- London Waste Limited
- Status
- Connected
- Capacity
- 60 MW
- Technology
- Energy from waste (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Tottenham
- Bulk supply point
- Tottenham Grid 33kV
- Voltage
- 33 kV
- Date connected
- 1 Jan 1999
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- EPN
- Address
- Edmonton
- Postcode
- N18 3AG
- Export MPAN
- 1023479109093
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.