Grid GuardianOpen the evidence in the app

Edmonton Incineration Plant

Edmonton Incineration Plant, London Waste Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Tottenham.

Customer
London Waste Limited
Status
Connected
Capacity
60 MW
Technology
Energy from waste (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Tottenham
Bulk supply point
Tottenham Grid 33kV
Voltage
33 kV
Date connected
1 Jan 1999
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Edmonton
Postcode
N18 3AG
Export MPAN
1023479109093

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source