Edmonton Eco Park
Edmonton Eco Park, North London Waste Authority, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Tottenham.
- Customer
- North London Waste Authority
- Status
- Accepted to connect
- Capacity
- 10 MW
- Technology
- Energy from waste (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Tottenham
- Bulk supply point
- Tottenham Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 26 Oct 2017
- Target energisation
- 30 Mar 2026
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Oct 2025
- Licence area
- EPN
- Address
- Advent Way, Edmonton
- Postcode
- N18 3AG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.