Edmonton Eco Park

Edmonton Eco Park, North London Waste Authority, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Tottenham.

Customer
North London Waste Authority
Status
Accepted to connect
Capacity
10 MW
Technology
Energy from waste (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Tottenham
Bulk supply point
Tottenham Grid 33kV
Voltage
33 kV
Date accepted
26 Oct 2017
Target energisation
30 Mar 2026
In a connection queue
Yes
Row last updated by the DNO
14 Oct 2025
Licence area
EPN
Address
Advent Way, Edmonton
Postcode
N18 3AG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.