Eastry Solar Farm

Eastry Solar Farm, Padero Solaer Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15.31 MW, grid supply point Sellindge.

Customer
Padero Solaer Limited
Status
Accepted to connect
Capacity
15.31 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Sellindge
Bulk supply point
Betteshanger
Point of connection
Betteshanger
Voltage
33 kV
Date accepted
18 Sept 2025
In a connection queue
Yes
Row last updated by the DNO
14 Oct 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Sandwich Road (Lan On The South Side), Sandwich
Postcode
CT13 0LY

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.