Dover Road

Dover Road, Greentech Invest (2) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 17 MW, grid supply point Richborough.

Customer
Greentech Invest (2) Limited
Status
Accepted to connect
Capacity
17 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough
Bulk supply point
Betteshanger Grid
Point of connection
Betteshanger Grid 33kV
Voltage
33 kV
Date accepted
10 Jun 2020
Target energisation
31 Oct 2025
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Dover Road, Dover
Postcode
CT15 5EW

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.