Dock Road

Dock Road, GB Ingredients, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.01 MW, grid supply point Bramford.

Customer
GB Ingredients
Status
Connected
Capacity
4.01 MW
Maximum import capacity
0 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Cliff Quay Grid 33kV
Point of connection
Dock Rd Primary 11kV
Voltage
11 kV
Date connected
8 Jan 2025
In a connection queue
No
Row last updated by the DNO
14 Apr 2025
Licence area
EPN
Address
Felixstowe
Postcode
IP11 3QW
Export MPAN
1050002028670/1050002028689

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.