Grid GuardianOpen the evidence in the app

Discovery Park

Discovery Park, Kent Renewable Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Richborough.

Customer
Kent Renewable Energy Limited
Status
Accepted to connect
Capacity
10 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough
Voltage
33 kV
Date accepted
14 Mar 2025
In a connection queue
Yes
Row last updated by the DNO
14 Jul 2026
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Sandwich
Postcode
CT13 9ND

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source