Denmark Hill Drive
Denmark Hill Drive, GTC the Electricity Network Co Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.6 MW, grid supply point Mill Hill.
- Customer
- GTC the Electricity Network Co Limited
- Status
- Accepted to connect
- Capacity
- 1.6 MW
- Technology
- Bioenergy (Steam-gas turbine (CCGT))
- Flexible connection
- No
- Grid supply point
- Mill Hill
- Point of connection
- Colindale Grid 11kV
- Voltage
- 11 kV
- Date accepted
- 25 Oct 2019
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- EPN
- Address
- London
- Postcode
- NW9 4BQ
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.