Denmark Hill Drive

Denmark Hill Drive, GTC the Electricity Network Co Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.6 MW, grid supply point Mill Hill.

Customer
GTC the Electricity Network Co Limited
Status
Accepted to connect
Capacity
1.6 MW
Technology
Bioenergy (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Mill Hill
Point of connection
Colindale Grid 11kV
Voltage
11 kV
Date accepted
25 Oct 2019
In a connection queue
Yes
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
London
Postcode
NW9 4BQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.