Crockstead Farm
Crockstead Farm, LH DNO Grid Services Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Little Horsted.
- Customer
- LH DNO Grid Services Limited
- Status
- Accepted to connect
- Capacity
- 99.9 MW
- Technology
- Storage (Storage - Electrochemical (Batteries))
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Little Horsted
- Voltage
- 132 kV
- Date accepted
- 10 May 2022
- Target energisation
- 31 Oct 2037
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Apr 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Eastbourne Road, Lewes
- Postcode
- BN8 6PT
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.