Chapel Lane

Chapel Lane, Renewable Connections Developments Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Canterbury.

Customer
Renewable Connections Developments Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Canterbury
Voltage
132 kV
Date accepted
19 Jul 2024
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Canterbury
Postcode
CT2 9HF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.