Cambridge Sewage Treatment Works

Cambridge Sewage Treatment Works, Anglian Water, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.14 MW, grid supply point Burwell.

Customer
Anglian Water
Status
Connected
Capacity
1.14 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Burwell
Bulk supply point
Arbury Grid 33kV
Point of connection
Arbury Grid 11kV
Voltage
11 kV
Date connected
9 Mar 2011
In a connection queue
No
Row last updated by the DNO
12 Dec 2025
Licence area
EPN
Address
Cowley Road, Cambridge
Postcode
CB4 0DN
Export MPAN
1050000807127
Import MPAN
1014569486620

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.