Bury Road

Bury Road, MJS Grid Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Bramford.

Customer
MJS Grid Services Limited
Status
Connected
Capacity
49.9 MW
Maximum import capacity
0 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Voltage
132 kV
Date accepted
30 Aug 2019
Date connected
12 Sept 2024
In a connection queue
No
Row last updated by the DNO
14 Oct 2025
Licence area
EPN
Address
Thetford
Postcode
IP24 2PR
Export MPAN
1050002509776

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.