Bumpers Farm Ilmer Bucks
Bumpers Farm Ilmer Bucks, Rethink Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.5 MW, grid supply point Amersham.
- Customer
- Rethink Energy Limited
- Status
- Connected
- Capacity
- 49.5 MW
- Maximum import capacity
- 49.5 MW
- Technology
- Storage (Storage - Electrochemical (Batteries))
- Flexible connection
- No
- Grid supply point
- Amersham
- Voltage
- 132 kV
- Date connected
- 29 Sept 2023
- In a connection queue
- No
- Row last updated by the DNO
- 14 Nov 2023
- Licence area
- EPN
- Address
- Ilmer
- Postcode
- HP27 9RE
- Export MPAN
- 1097000000537
- Import MPAN
- 1097000000528
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.