Britton Court Farm
Britton Court Farm, Britton Court Energy Centre Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Canterbury.
- Customer
- Britton Court Energy Centre Limited
- Status
- Accepted to connect
- Capacity
- 40 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Canterbury
- Point of connection
- Canterbury North 132kV
- Voltage
- 132 kV
- Date accepted
- 21 Sept 2022
- Target energisation
- 31 Oct 2036
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Apr 2024
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Britton Court Farm, Hackington Road, Canterbury
- Postcode
- CT2 9NG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.