Bride Farm

Bride Farm, Greenvolt Power UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40.8 MW, grid supply point Richborough.

Customer
Greenvolt Power UK Limited
Status
Accepted to connect
Capacity
40.8 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough
Voltage
132 kV
Date accepted
25 Aug 2026
In a connection queue
Yes
Row last updated by the DNO
14 Sept 2026
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Richborough Road, Canterbury
Postcode
CT3 2NJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.