Brazier Landfill Site

Brazier Landfill Site is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.15 MW, grid supply point Rye House.

Status
Connected
Capacity
5.15 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Rye House
Bulk supply point
Rye House Grid 33kV
Point of connection
Glaxo Primary 11kV
Voltage
11 kV
Date connected
29 Feb 2000
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Ware
Postcode
SG12 0EF
Export MPAN
1023525150264

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.