Booker Cash & Carry

Booker Cash & Carry, Sterling Power Utilities, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.5 MW, grid supply point Elstree.

Customer
Sterling Power Utilities
Status
Connected
Capacity
5.5 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Elstree
Bulk supply point
Hatfield Grid 33kV
Point of connection
Tunnel Primary 11kV
Voltage
11 kV
Date connected
9 Nov 2011
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Hatfield
Postcode
AL10 7TR
Export MPAN
1030078491875

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.