Bockingfold Farm

Bockingfold Farm, Bockingfold Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49 MW, grid supply point Northfleet East.

Customer
Bockingfold Solar Limited
Status
Accepted to connect
Capacity
49 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Northfleet East
Voltage
132 kV
Date accepted
4 Feb 2021
Target energisation
24 Apr 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Bockingfold Farm, Tonbridge
Postcode
TN12 9PH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.