Grid GuardianOpen the evidence in the app

Bloomberg Building

Bloomberg Building, Bloomberg Building, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.4 MW, grid supply point City Road.

Customer
Bloomberg Building
Status
Connected
Capacity
2.4 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
City Road
Bulk supply point
Finsbury Mkt F 33kV
Voltage
11 kV
Date connected
27 Jul 2017
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
London Power Networks plc
Address
3 Queen Victoria Street, City Of London
Postcode
EC4N 4TQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source