Block E Energy Centre (G)

Block E Energy Centre (G), UK Power Solutions, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Mill Hill.

Customer
UK Power Solutions
Status
Connected
Capacity
1.2 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Mill Hill
Point of connection
Colindale Grid 11kV
Voltage
11 kV
Date connected
8 Sept 2016
In a connection queue
No
Row last updated by the DNO
14 Feb 2024
Licence area
EPN
Address
West Hendon Regeneration, Mill Hill
Postcode
NW9 7QA
Export MPAN
1050001099689

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.