Blaise Farm Quarry

Blaise Farm Quarry, Blaise Farm Quarry 18254, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Northfleet East.

Customer
Blaise Farm Quarry 18254
Status
Connected
Capacity
2 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Northfleet East
Bulk supply point
Pembury Grid 33kV
Point of connection
Mereworth 11kV
Voltage
11 kV
Date connected
5 Jan 2014
In a connection queue
No
Row last updated by the DNO
14 Jul 2021
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
King Hill, West Malling
Postcode
ME19 4PN
Export MPAN
1900090818026

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.