Biomass Plant Off Chalk Lane
Biomass Plant Off Chalk Lane, Iceni Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 45 MW, grid supply point Bramford.
- Customer
- Iceni Energy Limited
- Status
- Connected
- Capacity
- 45 MW
- Technology
- Bioenergy (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Bramford
- Bulk supply point
- Diss Grid 33kV
- Voltage
- 33 kV
- Date connected
- 29 Mar 2017
- In a connection queue
- No
- Row last updated by the DNO
- 14 Feb 2023
- Licence area
- EPN
- Address
- Norwich
- Postcode
- NR16 2JZ
- Export MPAN
- 1050001084229
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.