Bay Farm

Bay Farm, Switch 2 Renewable, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8 MW, grid supply point Bramford.

Customer
Switch 2 Renewable
Status
Connected
Capacity
8 MW
Maximum import capacity
0.1 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Bury Grid 33kV
Voltage
33 kV
Date connected
8 Mar 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bury St Edmunds
Postcode
IP28 6BS
Export MPAN
1050000579327

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.