Battersea Development
Battersea Development, Battersea Main Energy Centre, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point Wimbledon 132kV 3 & 4.
- Customer
- Battersea Main Energy Centre
- Status
- Connected
- Capacity
- 4 MW
- Technology
- Gas (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Wimbledon 132kV 3 & 4
- Point of connection
- Stewarts Rd 11kV
- Voltage
- 11 kV
- Date connected
- 17 Sept 2020
- In a connection queue
- No
- Row last updated by the DNO
- 12 Nov 2021
- Licence area
- London Power Networks plc
- Address
- Cringle Street, Battersea
- Postcode
- SW11 8BX
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.