Barvills Farm

Barvills Farm, BE Renewables Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.5 MW, grid supply point Tilbury.

Customer
BE Renewables Limited
Status
Connected
Capacity
2.5 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Tilbury
Bulk supply point
Tilbury Compact Grid 33kV
Point of connection
Bata Primary 11kV
Voltage
11 kV
Date connected
24 Mar 2017
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Princess Margaret Road East, Tilbury
Postcode
RM18 8PA
Export MPAN
1050001287905

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.