Barley Brigg Farm
Barley Brigg Farm, Powersystems UK Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1 MW, grid supply point Bramford.
- Customer
- Powersystems UK Limited
- Status
- Connected
- Capacity
- 1 MW
- Maximum import capacity
- 0.2 MW
- Technology
- Bioenergy (Gas turbine (OCGT))
- Flexible connection
- No
- Grid supply point
- Bramford
- Bulk supply point
- Wickham Market Grid 33kV
- Point of connection
- Laxfield Primary 11kV
- Voltage
- 11 kV
- Date connected
- 1 May 2015
- In a connection queue
- No
- Row last updated by the DNO
- 15 Jan 2021
- Licence area
- EPN
- Address
- Laxfield Road, Stradbroke
- Postcode
- IP21 5NQ
- Export MPAN
- 1050000725635
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.