Aylesford Newsprint Ltd (Burham) 9265
Aylesford Newsprint Ltd (Burham) 9265, RWE Cogen UK Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Northfleet East.
- Customer
- RWE Cogen UK Limited
- Status
- Connected
- Capacity
- 50 MW
- Technology
- Gas (Steam-gas turbine (CCGT))
- Flexible connection
- No
- Grid supply point
- Northfleet East
- Bulk supply point
- Burham 33kV
- Voltage
- 33 kV
- Date connected
- 11 Jan 2012
- In a connection queue
- No
- Row last updated by the DNO
- 14 Oct 2022
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- New Hythe Lane, Maidstone
- Postcode
- ME20 7PB
- Export MPAN
- 1900060436880
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.