(ANM) SS17 9LL The Manorway
(ANM) SS17 9LL The Manorway, Eclipse Power Generation, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Tilbury.
- Customer
- Eclipse Power Generation
- Status
- Accepted to connect
- Capacity
- 20 MW
- Technology
- Gas, Storage (Engine (combustion / reciprocating))
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Tilbury
- Bulk supply point
- Coryton Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 28 Sept 2021
- Target energisation
- 30 Nov 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- The Manor Way, Stanford-Le-Hope
- Postcode
- SS17 9LL
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.