(ANM) SS17 9LL The Manorway

(ANM) SS17 9LL The Manorway, Eclipse Power Generation, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Tilbury.

Customer
Eclipse Power Generation
Status
Accepted to connect
Capacity
20 MW
Technology
Gas, Storage (Engine (combustion / reciprocating))
Flexible connection
Yes (capacity not firm)
Grid supply point
Tilbury
Bulk supply point
Coryton Grid 33kV
Voltage
33 kV
Date accepted
28 Sept 2021
Target energisation
30 Nov 2024
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
The Manor Way, Stanford-Le-Hope
Postcode
SS17 9LL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.