Grid GuardianOpen the evidence in the app

(ANM) Low Fen Drove Way

(ANM) Low Fen Drove Way, Fen Ditton Solar And Battery Storage Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Burwell.

Customer
Fen Ditton Solar And Battery Storage Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Burwell
Voltage
132 kV
Date accepted
26 Aug 2021
Target energisation
31 Oct 2031
In a connection queue
Yes
Row last updated by the DNO
14 Dec 2022
Licence area
EPN
Address
Fen Ditton, Horningsea
Postcode
CB25 9AT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.