(ANM) Land To The North Of Greys Lane
(ANM) Land To The North Of Greys Lane, Pathfinders Clean Energy (PACE), is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 27 MW, grid supply point Bramford.
- Customer
- Pathfinders Clean Energy (PACE)
- Status
- Accepted to connect
- Capacity
- 27 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bramford
- Bulk supply point
- Halesworth Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 30 Apr 2021
- Target energisation
- 31 Dec 2028
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Dec 2022
- Licence area
- EPN
- Address
- Ipswich
- Postcode
- IP19 0RJ
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.