(ANM) Land On The South East Side Of Wilsons Road

(ANM) Land On The South East Side Of Wilsons Road, Regener8 Power Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Burwell.

Customer
Regener8 Power Limited
Status
Accepted to connect
Capacity
20 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Burwell
Bulk supply point
Histon Grid 33kV
Voltage
33 kV
Date accepted
16 Jun 2020
Target energisation
31 Oct 2028
In a connection queue
Yes
Row last updated by the DNO
14 Dec 2022
Licence area
EPN
Address
Longstanton
Postcode
CB4 2EE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.