(ANM) Land North Of Jack'S Lane
(ANM) Land North Of Jack'S Lane, Padero Solaer Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20.2 MW, grid supply point Bramford.
- Customer
- Padero Solaer Limited
- Status
- Accepted to connect
- Capacity
- 20.2 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bramford
- Bulk supply point
- Stowmarket Grid 132/33kV
- Voltage
- 33 kV
- Date accepted
- 13 Aug 2025
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Sept 2025
- Licence area
- EPN
- Address
- Combs, Stowmarket
- Postcode
- IP14 2NG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.