(ANM) Kingsey Solar Farm

(ANM) Kingsey Solar Farm, Low Carbon, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Amersham.

Customer
Low Carbon
Status
Accepted to connect
Capacity
7 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Amersham
Bulk supply point
Ilmer Grid 33kV
Voltage
33 kV
Date accepted
23 Feb 2022
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
Ilmer
Postcode
HP27 9QX

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.