(ANM) Hatfield Grid

(ANM) Hatfield Grid, AMP PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.1 MW, grid supply point Elstree.

Customer
AMP PLC
Status
Connected
Capacity
5.1 MW
Maximum import capacity
5.06 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Elstree
Bulk supply point
Hatfield Grid 33kV
Point of connection
Hatfield Primary 11kV
Voltage
11 kV
Date connected
6 May 2025
In a connection queue
No
Row last updated by the DNO
14 Aug 2025
Licence area
EPN
Address
Dellsome Lane, Colney Heath
Postcode
AL4 0QT
Export MPAN
1050003122416

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source