Grid GuardianOpen the evidence in the app

(ANM) Enterline Solar Farm

(ANM) Enterline Solar Farm, Low Carbon Solar Park 42 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Burwell.

Customer
Low Carbon Solar Park 42 Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Burwell
Bulk supply point
Burwell Local Grid 33kV
Voltage
33 kV
Date accepted
21 Apr 2023
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
Heath Road, Cambridge
Postcode
CB25 0LA

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source