(ANM) Coventry Farm
(ANM) Coventry Farm, Six Oaks Renewable Energy Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 35 MW, grid supply point Burwell.
- Customer
- Six Oaks Renewable Energy Park Limited
- Status
- Accepted to connect
- Capacity
- 35 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Burwell
- Bulk supply point
- Fulbourn Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 26 Jan 2022
- Target energisation
- 31 Oct 2031
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- Six Mile Bottom, Newmarket
- Postcode
- CB8 0UW
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.