(ANM) Clay Lane
(ANM) Clay Lane, Clay Lane Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Bramford.
- Customer
- Clay Lane Solar Limited
- Status
- Accepted to connect
- Capacity
- 20 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bramford
- Bulk supply point
- Clacton Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 26 May 2021
- Target energisation
- 31 Oct 2031
- In a connection queue
- Yes
- Row last updated by the DNO
- 13 Sept 2024
- Licence area
- EPN
- Address
- Clacton On Sea
- Postcode
- CO16 8HG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.